Documents

Map Viewer User Guides & Tutorials:

Map Viewer User Guide (Version 4, 2025)
This guide explains the types of data included in the map viewer (updated for Version 4, 2025).

Flood Hazard Assessment Tools – Webinar Recording – December 9, 2025
This webinar discusses 2025 data and tool updates to the Sketch Planning Tool and AOI Tool Resilience Report. The webinar included: information about the purpose of the tools and hazards in Florida, background and data for each tool, and a demo of each tool. Download the Webinar Slides

Transplex 2020 Webinar:  Drowning in Scenarios? Decision Making for Sea Level Rise
This webinar discusses how to choose an appropriate sea level rise (SLR) scenario (or set of scenarios) based on a number of factors, such a time, risk tolerance, and probability. Next, the webinar will discuss updates to the Sea Level Scenario Sketch Planning Tool and how to get SLR scenario data for your planning needs. 

AOI Tool Resilience Report Guides:

AOI Resilience Report Tool Webinar
This webinar discusses how to use the Area of Interest – Resilience Report tool.

Resilience Report – User Guide
This is a detailed guide to step users through how to use the Area of Interest – Resilience Report tool.

Resilience Report – Quick Guide
This is a shorter guide to summarize how to use the Area of Interest – Resilience Report tool.

GIS Data Download Guides:

These guides explain how to download GIS data from the Map Viewer and describe the types of GIS layers in the download:

Data & Methods Used in this Project:

Project Documentation:

Phase 1, Completed December 2013

Development of a Geographic Information System (GIS) Tool for the Preliminary Assessment of the Effects of Predicted Sea Level and Tidal Change on Transportation Infrastructure, FDOT Contract BDK75-977-63

Executive Summary

Final Report

Phase 2, Completed October 2015

Testing and Enhancement of the Florida Sea Level Scenario Sketch Planning Tool, FDOT Contract BDV31-932-1

Executive Summary

Final Report

MPO Training & Resources, Completed December 2017

Post Evaluation Report, Contract BDV31 932-03